ホーム > ニュース一覧 > Construction of a New Factory

A state of the laboratory and an announcement

 

March 18 (Sat) on Heisei 20 


It is in the middle of March. I feel a sign of spring gradually.

 

Suddenly, I uploaded "Watergreen latest video" released at our booth at Convertte Japan 2017 last month to the video distribution service "YouTube"!

 

https://youtu.be/N0TQSz8eGtQ

 

I do not know who saw it at the exhibition, but the appearance of printing is added!

In addition to the above, there are places that have been changed / added, so please have a look ♪

   

March 2, 2007 (Thursday) 


 

 

It went so fast in February, and it entered in March. Last season in FY28 · · · Early ...

 

Today is the update notice of the homepage!

CI Flexographic Printing Machine Watergreen and non-solvent log laminator pages were created!

Each page can be moved from the following.

 

 Watergreen

 Non-solventvent laminator

 

Please have a look ♪

 

 挿絵(いらすとや)

February 18 (Sat) on Heisei 20 


[ConvaTec Japan 2017] from 16th to 18th We had you visit our booth, thank you!

Excellent for non-solventvent laminator, actual introduction of WATERGREEN, etc. Were you able to enjoy? (^ - ^)

 

The pictures of the CI flexo printing machine on the main panel were almost exactly the size!

Although there was no actual machine exhibition of the flexo printing machine this time, I think whether it was able to feel about the size of roughly.

 

I think that the booth also had an atmosphere of cleanliness based on white and blue.

 

I forgot to take a picture, but I felt that the sleeve stocker's reactions were good and it was nice to see it.

 

 ブース

 ノンソル

 

サンプル

 

 

 

Print samples on CI flexo printing press are also available in paper (4 colors) · transparent film (2 types of thickness) · milky white film ready.

I would like to make further adjustments in the future and strive to make more beautiful printing possible.

 

 

Lastly, if you are interested in domestic CI flexo printing machine or non-solventvent laminator, if you are considering introduction, please use test printing in our lab.

We will be waiting for you as it is possible if it is between remodeling and adjustment etc. ★ ★

February 6, Heisei 29 (Monday)


It is an exhibition notice.

We will exhibit to the Converting Technology Comprehensive Exhibition [Convertech Japan 2017] to be held from 15th to 17th this month!

Tokyo Big Sight East Hall booth number "3 V - 15".

 

We are planning to exhibit the Webcontrol made non-solvent laminator on actual machine! * It does not operate

Other samples printed with CI flexo printing machine (test machine) are also scheduled to be exhibited.

 

Detailed date and time , please click here .

 

***

 

Introduction of our laboratory and the advertisement of the company sponsored on our [Food packaging February issue] published by Daily business business are posted!

I would be pleased if you could also read this one (* ^^ *)

 

 

 

 

January 18 (Wed) Heisei 20 


Have you already seen the [Convertech January] published by the Processing Technology Research Group?

Articles about our laboratory and CI flexo printing machine "Watergreen" are posted! (* ゚ ▽ ゚ ゙

 

We are pleased if you can read it!

 

 挿絵(いらすとや)

 

 

Thursday, January 5, Heisei 30


Happy New Year. Thank you very much again this year

(^ ^ 〃)

Let's do our best together so that it will be a year of leap for not only us but everyone ♪

 

Happy New Year, at last it's the Converting Technology Comprehensive Exhibition next month!

We will exhibit to Convertte Japan 2017.

I think that it would be good if we could inform you about this later (^ ▽ ^;)

 

 

 

 

 

Wednesday, December 28,


I am indebted to 2016 very much.

Thank you for much cooperation in the development of Watergreen, I can not thank you enough. In order to return it surely, 2017 will also be the company all round, we will continue to excite CI aqueous flexographic printing machines!

In the laboratory we are making adjustments / remodeling etc. for film printing.

We will close the business within the year as of today, but please do so next year as well.

Have a nice year.

 

 Watergreen

 

 

November 5 (Sat) on Heisei 28 


At Watergreen Lab, CI flexographic printing machine [WATERGREEN] and non-solventvent laminator are being finely adjusted.

Such a laboratory, but the other day, a signboard was finally set up!

It is a small feeling, but it is deeply impressed when a signboard is attached like this ~. The pattern of the waves is smart.

 

I also want you to remember our new logo. It is a cool blue one.

It is not an imposter of soba! It is real!

   

 ラボ看板

 

 新ロゴ

 

October 17 (Monday), Heisei 28 


Thank you for coming to our booth at "Flexo Japan 2016 Forum & Tabletop Show" which was held on 13th and 14th October last week.

The next exhibition will be "Convertech JAPAN 2017" to be held from 15th to 17th of February next year .

 We would like to report on our booth etc as soon as we are decided.

 

Laboratory trial operation and adjustment of each machine.

I want to put a picture if I can shoot the inside of the building ~.

建物内の様子を撮影できたら写真を貼りたいですね~。

 

 

 

 

 

 

Tuesday, October 11, Heisei 28 


Thank you for coming to our booth at "TOKYO PACK 2016" which was held from 4th to 7th October last week.

Introduction of flexographic printing machine "WATERGREEN" How was it like movies?

 

Well the next exhibition will be "Flexo Japan 2016" Forum & Tabletop Show Top Show to be held on 13th and 14th October this week .

We will exhibit at the table top show. I think that I would be able to tell you more about "WATERGREEN", so I think that you can come by all means.

 

Please check the details on the link below.

news list

 

In laboratory, we installed and installed non-solventvent laminator made by WEB exhibited at "TOKYO PACK 2016", trial operation / adjustment.

 

 

Flexo Japan 2016

Dates: October 13 and 14, Heisei 28

Venue: TFT Building East Building 9th Floor

Booth: 15

 

 

October 6, 2008 (Thursday) 


It will be the first time in a month. Several reports ...

 

First of all, the official name of the new factory was decided! To be exact, it was decided in September, but we were unable to inform you at the preparation etc. of the exhibition which is currently being held (^ _ ^;)

The factory name is 【Watergreen Lab (Water Green Lab)】. As it is known as "Laboratory", please contact us at "Laboratory" when making inquiries.

 

Secondly, secondly, as I mentioned earlier, Mr. Musashino Keikai and Webcontrol group company are jointly present at the exhibition "TOKYO PACK 2016" currently being held at Tokyo Big Sight So I think that you can visit us.

At the booth we are sending a newly created PR movie. I am publishing it on Youtube so I think that you can see it.

 

In laboratory adjustment and trial operation of CI flexo printing machine are proceeding.

 

 

 

September 2 (Fri) on Heisei 28 


Although the number of days has become empty, here was the relocation of the CI flexo printing machine "WATERGREEN".

Although CI type flexo is said to be center drum type, the official name of 【CI】 is said to be [central impression]. It is cool.

 

Outdoor construction is proceeding as well.

   

16/8/19新工場写真

 

16/8/19新工場写真

Friday, August 19, 

It seems that the construction was resumed and entered the stage of finishing with scissors closed during the Obon festival.

Works in the hot sunlight seems to be tough.

 

There were tiles on the stairs in front of the entrance.

It seems difficult to stick one by one evenly or break tiles to be put in a small gap.

   

16/8/19新工場写真

 

16/8/19新工場写真

Tuesday, August 9, 

It seems that the entrance is about to be completed.

The wallpaper is also cleanly affixed, and the shoe bag embedded in the wall is very nice ('-' *)

Embedding in the wall can secure space, it is two stone with one stone.

   

16/8/9新工場写真

 

16/8/9新工場写真

16/8/9新工場写真

 

16/8/9新工場写真

 

 

Construction of the ceiling is progressing more and more.

 

What seems to be an outdoor unit of air conditioner ...

It seems that you can work in a comfortable environment with perfect air conditioning equipment.

August 1, 2008 (Monday) 

There are many building materials etc for interior in the building. Is the thing that is sticking yellow and yellow is insulation?

Tubes which are thought to be water pipes are also arranged.

 

16/8/1新工場写真

 

16/8/1新工場写真

16/8/1新工場写真

 

16/8/1新工場写真

 

 

The exposed steel frame was cleanly hidden by the plywood board, and the appearance became neat.

The pipes are covered with soil from above.

July 26 (Tuesday) Heisei 28 

A wonderful entrance was made. The inside is pitch dark.

Construction of the outer wall seems to be finished, disassembly of the scaffold is done.

   

16/7/26新工場写真

 

16/7/26新工場写真

Friday, July 21, 

Because the construction of the walls in all directions, the back side of the bright one is pitch dark.

I do not consider lighting. Because it is a factory, it probably is good. If you add electricity it will be bright!

 

16/7/21新工場写真

 

16/7/21新工場写真

Friday, July 15, 

The inner wall and the outer wall are being constructed. Window was also attached.

 

Is the exterior wall Totan? Is it a fashionable galvanized steel sheet?

Galvanized steel sheet is light and strong, and it seems that it is often used as a roofing material in many cases.

Oh, is it siding? What?

   

16/7/15新工場写真

 

16/7/15新工場写真

Tuesday, July 12,


A roof was made, and I began to shield the rain and the sun. But every day summer day! Even in the shade it is hot! But workers are long sleeves. Is cheers for good work.

 

There are many rectangular frames that seem to be window sashes.

   

16/7/12新工場写真

 

16/7/12新工場写真

July 6 (Wed) Heisei 28 

It seems that the pillars and beams are gradually constructed and a blue net is installed for safety measures of a high place work.

 

Well, what kind of machine would you like to polish that floor? Is it really a machine to polish the floor ...?

I wonder if I'm polishing ('- ω - `) hm · · ·

   

16/7/6新工場写真

 

16/7/6新工場写真

June 27 (Monday) Heisei 28

To prevent air from entering, pour the concrete up to every corner with a stick or the like and flatten it with squared timber.

It is exactly a craft workmanship to make it flat neatly (゜ ▽ ゜ *)

   

16/6/27新工場写真

 

16/6/27新工場写真

16/6/27新工場写真

 

16/6/27新工場写真

 

 

 

A scaffolding was assembled unnoticedly. I am afraid because it is meshed and you can see the bottom when walking on the top.

The person of height work is amazing!

Wednesday, June 22, 28 (Wed) 

Because there is a lot of concrete flowing, I am carrying out leveling of the bank while sinking.

It is easier to walk on the flat side and efficiency of the work is improved so that it is better to do it ◎

 

 

16/6/22新工場写真

 

16/6/22新工場写真

Friday, June 17, 

Transparent vinyl sheets are laid on the cleanly grounded ground.

I think that it is a measure against moisture ...

A steel frame began to be built on top. It will flow concrete.

   

16/6/17新工場写真

 

16/6/17新工場写真

Tuesday, June 14, 

The foundation is rising, low walls of concrete are completed!

A yellow cover is attached to the tip of the rebar so that safety measures are taken.

   

16/6/14新工場写真

 

16/6/14新工場写真

16/6/14新工場写真

 

16/6/14新工場写真

 

 

As the rain of the previous day is a lie, it is sunny well (* ^^ *)

You can see the part covered with blue seats in the back. What can I do?

June 6 (Monday) Heisei 28 

The concrete below solidified and the wooden frame was removed.

It's disgusting with the steel frame jumping out ('~ `) Woons 

 

 

16/6/6新工場写真

 

16/6/6新工場写真

16/6/6新工場写真

 

16/6/6新工場写真

 

 

In the afternoon, a wooden frame was beginning to be assembled to surround the projecting steel frame.

 

Since the weather was cloudy, was the workers easy to work as well?

Good work every day.

 

 

 

Tuesday, June 2, 

Steel frame for hammering started to be assembled.

It seems to be surprisingly difficult to wind the rebar with a wire.

 

 

16/6/2新工場写真

 

16/6/2新工場写真

May 27 (Fri) on Heisei 28 

Unfortunately it is raining today.

Rain accumulated in the groove dug to hit the foundation and it became a puddle.

 

 

 

16/5/27新工場写真

 

16/5/27新工場写真

May 24 (Heisei) Heisei 28 

It seems something sandbags are piled up.

Excavation work, filling work ...

 

 

16/5/24新工場写真

 

16/5/24新工場写真

16/5/24新工場写真

 

16/5/24新工場写真

 

 

 The stacked sandbag (?) Is covered completely with blue sheets.

 

 

 

May 23 (Monday) Heisei 28 

Construction of a new factory began.

It was blessed with weather, and it made a very good start (= ^ e ^ =)

 

 

 

16/5/23新工場写真

 

16/5/23新工場写真

16/5/23新工場写真

 

16/5/23新工場写真

 

 

Continued ground work in the afternoon in the morning?